Recent Planning Applications

The Old Forge High Street Elmdon Essex CB11 4NL

8th April 2024

Revise external glazing design, remove existing mezzanine, revise bathroom layout and confirm floor construction to existing outbuilding

The Old Forge High Street Elmdon Essex CB11 4NL

8th April 2024

Revise external glazing design, remove existing mezzanine, revise bathroom layout and confirm floor construction to existing outbuilding

Bury Cottage Bury Lane Elmdon Essex CB11 4NF

5th April 2024

Fell 1no. Willow and 1no. Conifer

The Old House Bridge Green Road Elmdon Essex CB11 4XA

28th February 2024

External and internal alterations to South-West Cottage including replacement of late C20th windows with traditional slim double glazed casement with integral bars, new chimney stacks and associated services

The Old House Bridge Green Road Elmdon Essex CB11 4XA

28th February 2024

External and internal alterations to South-West Cottage including replacement of late C20th windows with traditional slim double glazed casement with integral bars, new chimney stacks and associated services

Rockells Farm Rockells Lane Elmdon Essex CB11 4UY

5th February 2024

Erect a new storage shed and erect a lean-to extend an existing store

Humphreys Green Kings Lane Elmdon Essex CB11 4NN

1st February 2024

Proposed increase in chimney height from 1m to 1.8m by building up the brickwork with appropriate matching bricks

Humphreys Green Kings Lane Elmdon Essex CB11 4NN

1st February 2024

Proposed increase in chimney height from 1m to 1.8m by building up the brickwork with appropriate matching bricks

Pump Cottage Ickleton Road Elmdon Essex CB11 4LT

11th January 2024

Single storey rear extension, alterations and conservation repairs

Pump Cottage Ickleton Road Elmdon Essex CB11 4LT

11th January 2024

Single storey rear extension, alterations and conservation repairs

Carpenters Cottage High Street Elmdon Saffron Walden Essex CB11 4NL

19th December 2023

1no. weeping willow- pollard- cut back to previous shape

Pump Cottage Ickleton Road Elmdon Saffron Walden Essex CB11 4LT

19th December 2023

Sycamore tree- rear crown, 30% thin

Drumcon Ickleton Road Elmdon Essex CB11 4LT

4th December 2023

Single storey ground floor side and rear extension, first floor rear extension with a second floor pitched/hipped roof

The Old Vicarage Ickleton Road Elmdon Essex CB11 4LT

21st November 2023

Crown reduction of 75-80% on 2no. Holm Oaks

The Meadows Duddenhoe End Elmdon Saffron Walden CB11 4UU

14th November 2023

Application to discharge condition 4 (method statement) attached to UTT/23/2214/LB.

The Meadows Duddenhoe End Elmdon Saffron Walden CB11 4UU

8th November 2023

Application to discharge condition 3(materials) attached to UTT/23/2214/LB

The Old Forge High Street Elmdon Essex CB11 4NL

18th September 2023

2no. rooflights on flank elevation of approved applications UTT/22/1076/HHF and UTT/22/1077/LB and the relocation and enlargement of bike shed approved under UTT/22/1487/HHF.

The Old Forge High Street Elmdon Essex CB11 4NL

18th September 2023

2no. rooflights on flank elevation of approved applications UTT/22/1076/HHF and UTT/22/1077/LB and the relocation and enlargement of bike shed approved under UTT/22/1487/HHF.

The Hoops Ickleton Road Elmdon Saffron Walden Essex CB11 4LT

7th August 2023

Non-material amendment to UTT/20/1468/HHF - roof integrated solar installation

Drumcon Ickleton Road Elmdon Essex CB11 4LT

5th July 2023

Proposed second and two storey rear extension, single storey side extension

Newland House High Street Elmdon CB11 4NL

27th June 2023

Application to discharge condition 8 (Lighting Design) of UTT/20/2294/FUL

The Old Forge High Street Elmdon Essex CB11 4NL

27th June 2023

Restoration and change of use of outbuilding, to include the addition of 3 x conservation rooflights (further to UTT/22/1076/HHF & UTT/22/1077/LB).

The Old Forge High Street Elmdon Essex CB11 4NL

27th June 2023

Restoration and change of use of outbuilding, to include the addition of 3 x conservation rooflights (further to UTT/22/1076/HHF & UTT/22/1077/LB).

Harlow Cottage Kings Lane Elmdon Essex CB11 4NN

19th June 2023

Proposed erection of 1 and a half storey rear extension accessed by a second staircase. Conversion of existing outbuilding to form ground floor bedroom and a single storey zinc roof structure to linking the two.

Harlow Cottage Kings Lane Elmdon Essex CB11 4NN

19th June 2023

Proposed erection of 1 and a half storey rear extension accessed by a second staircase. Conversion of existing outbuilding to form ground floor bedroom and a single storey zinc roof structure to linking the two.